Customized Solution

CUSTOM DESIGN

We have excellent design team to help youdesign all aspects of the product.Provide your ideas and we can make it areality.

Demand Submission

Demand Submission

Customers upload customized requirements, and our company provides solutions and quotations.

Design Confirmation

Design Confirmation

Design drafts are issued within 48 hours, customers mark and modify, and the final draft needs to be electronically confirmed.

Physical Proofing

Physical Proofing

Samples are issued within 3-7 days, test reports are provided, DHL/FedEx is sent, and the platform tracks logistics.

Inspection Execution

Inspection Execution

Inspection reports are issued within 24 hours, non-conforming products are rectified to meet the standards, and the responsible party bears the costs.

Transparent Quotation

Transparent Quotation

Clearly estimate the cost of design, proofing and mass production.

Quality Assurance

Quality Assurance

Control quality throughout the process to avoid disputes.

Customized

Customized

OPP Bag/Foam+OPP/OPP Bag+Foam+white cardboard/OPP Bag+Foam+Custom printed

Accessory selection: Markers/Eraser/Storage bag/Pushbins/magnetic icons/Wiping cloth/Bottle

Color customization: Pantone international standard color card

Pattern customization: Any pattern

Size:
16*12inch/custom size
120*240cm
120*200cm
100*150cm
90*120cm
70*100cm
60*90cm
60*45cm

Material: mainly including MDF, acrylic PVC, PET, Papercard, EVA, We also support customization based on the suggestions made by other clients

Need to provide a well-arranged vector file (AL, CDR or PDF)

lf you need our typesetting, please providethe vector file of the LOGO (AL, CDR Or PDF),Relevant text information and layout reguirements

File format:

File format:CDR, Al, PDF with a resolution of 300 dpi or more, the source file needs to beconverted.

The design artwork needs to add a 1.5mm bleeding position around the size of the finished product.

Contact Us

NOTICES

Avoid Water

Avoid Water

MWipe with a dry cloth

MWipe with a dry cloth

Do not get wet

Do not get wet

Avoid sun exposure & floor heating

Avoid sun exposure & floor heating

Customer RequirementConfirmation

Customers submit customized requirements through the platform (such as uploading design sketches, technical parameters, material preferences, usage scenarios, etc.), and our company provides customized solutions and quotations (including design fees, sampling costs, and estimated production unit prices).

01

Customized Design and Sampling Stage

1. Design, development, and confirmation

The supplier shall provide design drafts (CAD drawings, 3D renderings, etc.) within 48 hours, and the customer shall annotate and modify them online. Real time adjustments can be made through video or telephone conferences. The final design draft requires the customer to confirm and sign an electronic confirmation letter to lock in technical details and avoid subsequent disputes.

2. Physical sampling and testing

Suppliers produce samples according to the confirmed draft (usually within 3-7 days) and provide material testing reports (such as RoHS, tensile testing, etc.) simultaneously. The sample is shipped using international logistics such as DHL/FedEx, and the logistics trajectory and customs clearance are fully tracked by the platform.

3. Sample feedback and iteration

After receiving the samples, customers can communicate online for modification suggestions (graphic/video feedback), and suppliers can optimize 1-2 times free of charge (additional times will be charged according to the agreement).

02

Pre Production Inspection Service

1. Inspection appointment and standard setting

After the customer confirms the mass production order, they can choose to have the platform on-site inspect the goods or have a third-party organization inspect the goods (such as SGS, BV). The inspection standards shall be confirmed by both parties in advance and included in the contract annex.

2. Production process monitoring

Suppliers regularly upload production progress photos/videos to the platform, and customers can view key milestones in real time (such as mold opening and first piece inspection). Platform quality inspectors conduct surprise inspections, focusing on checking the compliance of raw material batches and process flows.

3. Final inspection execution

The inspector shall conduct a full inspection or random inspection of the finished product according to the standard, and issue a Chinese and English inspection report (including defect photos and judgment results) within 24 hours. Unqualified products can be reworked or reproduced, and the platform will supervise the rectification until they meet the standards. The responsible party for the delay will bear additional costs.

03